Tomorrow at 9am, the guy comes to install the ceiling fans in the two “guest” bedrooms. Here’s the pictorial story so far: We load up on a thousand dollars’ worth of flooring, the same color and brand of “lock & fold” engineered stuff that finally saved the day on the original Floor Project from Hell. This time, we’ve also bought the pine quarter round, and bought an undercut saw, because last time we learned that the pre-finished quarter round that’s part of the flooring system was made of some kind of densely impenetrable wood that our pneumatic brad nailer couldn’t…
-
-
Private Harry Patch – Telegraph (tags: WWI) Summer Rituals – Sleep-Away Camp – A Century of Character-Building and Games – Series – NYTimes.com (tags: episcopal)
-
We cleared out the guest bedroom, as Monday the ceiling fan gets installed, and after that we rip up the horrid blue carpet and start on the floor project. The smallest bedroom has stuff stacked along the walls but the center is clear so a ceiling fan gets installed in there, too. Ginny I can has iPhone? Via: Flickr Title: Back to Hell: Progress Report By: GinnyRED57 Originally uploaded: 26 Jul ’09, 5.13pm CDT PST